Monday, 8 June 2015

Factory Tour in Pictures- External



Since moving to our site at Marchington a year ago, it's not just the interior of the warehouse that has had a revamp. The outside area has to gone under some significant changes.
                                       
Due to the increasing number of lorries passing through our gates, two security barriers have been put in place to increase security and assist operations.


All drivers must then report to the operations office before proceeding to a loading bay, making tracking equipment simple as well as accurate.


Once entering the PPS premises lorries are loaded and unloaded with returnable packaging from a total of seven loading bays. Three of which have been installed with high quality Thorworld dock level doors, platforms and ramps increasing efficiency and bringing down turnaround time.

A range of equipment passes through our doors, this includes plastic crates, collapsible pallet boxes and plastic pallets. 
  
Drivers must also report to the operations office when leaving the premises to ensure they receive correct dispatch information. 

To arrange your site tour contact us on 01283 821 502.

No comments:

Post a Comment